Demolitionforum.com Forums  

Register Now! Demolition Tool Store - Demolition Gallery - Classifieds - Advertising Info - Forum Guidelines

Welcome to Demolition Forum, the only Online Source for Demolition News and Discussion.

You are currently viewing our boards as a guest which gives you limited access. By joining our free community you will have access to reading the latest in Industry News, Read and learn from the experts, Upload your own demolition photos to your photo album, read and learn from the experts, and many other special features.

Registration is fast, simple and absolutely free so please, join our community today!

If you have any problems with the registration process or your account login, please contact us.


Go Back   Demolitionforum.com Forums > DEMOLITION TOPICS > Upcoming Projects / Sub-Bids Requested

Upcoming Projects / Sub-Bids Requested Projects that include full and/or select demolition. If your looking to share about projects or if you would like post your own sub-bid request.


Why not Register? or Log in to remove these ads
Reply
 
LinkBack Thread Tools Display Modes
  #1 (permalink)  
Old 04-24-2006, 08:25 AM
James's Avatar
Administrator
 
Join Date: Aug 2005
Location: Kent, WA.
Posts: 4,145
Send a message via AIM to James Send a message via MSN to James
Default Rocky Mountain Laboratories Building 31

This announcement is for a fixed-price design/build contract for construction of a new building of approximately 31,000 gross square feet to house laboratory, support services and administrative functions on the campus of the National Institutes of Health (NIH) Rocky Mountain Laboratories in Hamilton, Montana. This acquisition is being conducted on behalf of NIH by the Indian Health Service, Division of Engineering Services (IHS/DES) under an interagency agreement pursuant to the Economy Act. The building footprint is nominally 68’x138’ with basement level, two full stories above ground, and a mechanical penthouse. The exterior appearance and floor plans are defined. The building is conceived as a steel frame structure with exterior combination of brick and metal panels. The design and construction will include completion of all design details, connections to central campus systems (including steam, regular and emergency power, chilled water, communications, and security access), equipment requirements, finishes, and furnishings for a complete functional structure. Specialized requirements include adherence to National Institutes of Health Design Guidelines, vibration isolation, noise mitigation and blast damage resistance. The work includes demolition of three existing buildings, including one that occupies the new building site and two that will be demolished approximately 30 days after acceptance of the new building. The demolition will involve hazardous materials. Offerors will be evaluated using Two-Phase Design/Build Request for Proposal (RFP) procedures that will result in an award based on BEST VALUE to the Government, price and other factors considered. The general dollar magnitude of the project is between $5,000,000 and $10,000,000. The estimated period of performance is eighteen months. Responses to phase one of this procurement will consist of relevant experience (example projects); past performance; key personnel; general technical approach; quality control program; and representations and certifications. The information will be evaluated and up to five firms may be selected to submit technical and price proposals in phase two. Phase one evaluation factors include past performance, experience, capacity, and quality. Phase two evaluation factors may include quality of overall management plan, including phase one elements; technical solution responsiveness and quality; and price. Price and the overall technical rating are of approximately equal weight. Evaluation of price may involve total price or evaluation of scope/design options within the published budget for award. The phase two technical proposal will require preparation of a limited design solution, small business subcontracting effort, and other factors that define the quality of construction. Phase one of this solicitation will be issued on or about 17 April 2006 and will be posted on this website. Phase two will be issued to the short listed offerors after evaluation of phase one responses. Firms formally organized as design-build entities or design firms and construction contractors that have associated specifically for this project may submit proposals. In the latter case, a single design firm or construction contractor may offer more than one proposal by entering into more than one such association. This solicitation is being conducted on an unrestricted basis. All responsible sources may submit a bid, proposal, or quotation which shall be considered by the agency. Offerors must be registered in the Central Contractor Registration (CCR) database in order to participate in this procurement (http://www.ccr.gov).
Reply With Quote
Sponsored Links

Why not Register? or Log in to remove these ads
Reply



Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Forum Sponsors



Partners
Dexpan Silent Demo
High Reach Demo
Scrap Metal Prices
EnviroBidNet
Heavy Equipment Forums
Lawn Cafe
Phillyblast
Excavator Trader
Home Theater Forum

Advertising Partner


All times are GMT -7. The time now is 05:40 PM.


Powered by vBulletin® Version 3.7.1
Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.1.0
© 2005-2008 DemolitionForum - All Rights Reserved