Demolitionforum.com Forums  

Register Now! Demolition Tool Store - Demolition Gallery - Classifieds - Advertising Info - Forum Guidelines

Welcome to Demolition Forum, the only Online Source for Demolition News and Discussion.

You are currently viewing our boards as a guest which gives you limited access. By joining our free community you will have access to reading the latest in Industry News, Read and learn from the experts, Upload your own demolition photos to your photo album, read and learn from the experts, and many other special features.

Registration is fast, simple and absolutely free so please, join our community today!

If you have any problems with the registration process or your account login, please contact us.


Go Back   Demolitionforum.com Forums > DEMOLITION TOPICS > Upcoming Projects / Sub-Bids Requested

Upcoming Projects / Sub-Bids Requested Projects that include full and/or select demolition. If your looking to share about projects or if you would like post your own sub-bid request.


Why not Register? or Log in to remove these ads
Reply
 
LinkBack Thread Tools Display Modes
  #1 (permalink)  
Old 11-20-2007, 08:44 AM
James's Avatar
Administrator
 
Join Date: Aug 2005
Location: Kent, WA.
Posts: 4,191
Send a message via AIM to James Send a message via MSN to James
Default Disposal, Removal, Inspection, Approval and Reporting of ACM

The Four Corners Construction Office of the Bureau of Reclamation is scheduling demolition and removal of all structures within the Ridges Basin as part of the final completion contract for the Ridges Basin Dam and Reservoir. Asbestos removal from identified structures must take place prior to demolition. Results of the survey provided in a report dated October 1, 2007 from Plateau Inc. indicate that friable asbestos in quantities exceeding the State trigger level, and requiring removal were found in only one structure - the Bodo Farm House. Within the Bodo Farm House - five asbestos containing building materials were identified as: 1) Multi-colored linoleum, bathtub surround vertical surfaces - approx 50 sq ft. 2) Tan linoleum, bathtub surround horizontal surfaces, approx. 16 sq ft, 3) Gray transite located on the interior walls and ceiling of the foyer and laundry rooms, approx. 1,660 sq ft., 4) White caulk with green paint (window glazing), approx 525 sq ft, and 5) White/gray transite with green paint, exterior siding, approx 1,703 sq. ft. All five ACBMs will be required to be removed as part of this contract by a contractor certified by the State of Colorado under Sec. 8 regulations- subject of the scope of work. Following removal of ACBMs, air quality monitoring of the Bodo Farmhouse will be conducted by an independent air quality monitoring firm, also qualified under the State regulations and then following the air quality monitoring approval, the structure must be revisited by Plateau Inc. for final survey and approval for demolition. Final site visitation and approval shall be included in the scope of work. Contract will require disposal, removal, inspection, approval and reporting- for information and/or statement of work contact: Jere Ellenberger at 505-324-5047.
__________________
Still just visiting? Come say Hello!
We have some open advertising spots available
Reply With Quote
Sponsored Links

Why not Register? or Log in to remove these ads
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Remove carpet, carpet mastic, tile & mastic containing Asbestos James Upcoming Projects / Sub-Bids Requested 0 05-15-2006 09:07 AM


Forum Sponsors



Partners
Dexpan Silent Demo
Diamond Tools SuperCenter
High Reach Demo
Scrap Metal Prices
EnviroBidNet
Heavy Equipment Forums
Lawn Cafe
Phillyblast
Excavator Trader
Home Theater Forum

Advertising Partner


All times are GMT -7. The time now is 10:37 AM.


Powered by vBulletin® Version 3.7.1
Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.2.0
© 2005-2008 DemolitionForum - All Rights Reserved