Demolitionforum.com Forums  

Register Now! Demolition Tool Store - Demolition Gallery - Classifieds - Advertising Info - Forum Guidelines

Welcome to Demolition Forum, the only Online Source for Demolition News and Discussion.

You are currently viewing our boards as a guest which gives you limited access. By joining our free community you will have access to reading the latest in Industry News, Read and learn from the experts, Upload your own demolition photos to your photo album, read and learn from the experts, and many other special features.

Registration is fast, simple and absolutely free so please, join our community today!

If you have any problems with the registration process or your account login, please contact us.


Go Back   Demolitionforum.com Forums > DEMOLITION TOPICS > Upcoming Projects / Sub-Bids Requested

Upcoming Projects / Sub-Bids Requested Projects that include full and/or select demolition. If your looking to share about projects or if you would like post your own sub-bid request.


Why not Register? or Log in to remove these ads
Reply
 
LinkBack Thread Tools Display Modes
  #1 (permalink)  
Old 06-12-2007, 08:47 AM
James's Avatar
Administrator
 
Join Date: Aug 2005
Location: Kent, WA.
Posts: 4,206
Send a message via AIM to James Send a message via MSN to James
Default Building Foundation Stabilization Project

This Project consists of Stuttgart, Arkansas Building Foundation Stabilization Project for Building 1, at the USDA, ARS, National Aquaculture Research Center, Stuttgart, Arkansas. Location: USDA, ARS, National Aquaculture Research Center, Building #1 2955 Hwy. 130E. Almyra, Arkansas 72003 The Work consists of, but is not limited to, Removal and storage (in contractor’s portable buildings or portable trailers) of existing furniture, fixtures, lab casework, equipment, supplies, contents of casework, and miscellaneous items in each office and lab in each phase; demolition of existing walls and finishers; removal and replacement of existing ceilings; removal and replacement of flooring materials; repair and patching of existing concrete slab; modifications to piping supports; disconnecting and reconnecting of electrical items; disconnecting and reconnecting of mechanical and plumbing items; removal and replacement of existing concrete slab; modifications to piping supports; disconnecting and reconnecting of electrical items disconnecting and reconnecting of mechanical and plumbing items; removal and replacement of existing door and with a larger door, frame, hardware, automatic door opener, and associated devices; removal and replacement of existing concrete stoop; modifications to the top runner tracks of interior partitions; reinstallation and leveling of all lab case work, furnishing, countertops & backsplashes, regent shelves, furniture, equipment, etc. removed and stored in each phase of the work; sleeving of roof drains that penetrate the floor slab; installation of wall angles; painting and patching of walls; installation of new bracket supports for reagent shelves and backsplashes; fill and re-grading and re-grassing along perimeter exterior walls; new concrete sidewalk; and other associated items all in accordance with the Contract Documents. Estimated Price Range: $250,000 to $500,000 Pre-Bid Conference scheduled for July 11, 2007 at 10:30 a.m.
__________________
Still just visiting? Come say Hello!
We have some open advertising spots available
Reply With Quote
Sponsored Links

Why not Register? or Log in to remove these ads
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On
Forum Jump


Forum Sponsors



Partners
Dexpan Silent Demo
Diamond Tools SuperCenter
High Reach Demo
Scrap Metal Prices
EnviroBidNet
Heavy Equipment Forums
Lawn Cafe
Phillyblast
Excavator Trader
Home Theater Forum

Advertising Partner


All times are GMT -7. The time now is 10:34 AM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.2.0
© 2005-2008 DemolitionForum - All Rights Reserved