Demolitionforum.com Forums  

Register Now! Demolition Tool Store - Demolition Gallery - Classifieds - Advertising Info - Forum Guidelines

Welcome to Demolition Forum, the only Online Source for Demolition News and Discussion.

You are currently viewing our boards as a guest which gives you limited access. By joining our free community you will have access to reading the latest in Industry News, Read and learn from the experts, Upload your own demolition photos to your photo album, read and learn from the experts, and many other special features.

Registration is fast, simple and absolutely free so please, join our community today!

If you have any problems with the registration process or your account login, please contact us.


Go Back   Demolitionforum.com Forums > DEMOLITION TOPICS > Upcoming Projects / Sub-Bids Requested

Upcoming Projects / Sub-Bids Requested Projects that include full and/or select demolition. If your looking to share about projects or if you would like post your own sub-bid request.


Why not Register? or Log in to remove these ads
Reply
 
LinkBack Thread Tools Display Modes
  #1 (permalink)  
Old 06-16-2006, 10:19 AM
James's Avatar
Administrator
 
Join Date: Aug 2005
Location: Kent, WA.
Posts: 4,206
Send a message via AIM to James Send a message via MSN to James
Exclamation Demolition of Junipero Serra State Office Building

Nice size project:

The US General Services Administration is seeking sources to demolish an existing building. The demolition will be in preparation for clearance of a federally owned site to construct a new 1,000,000 square foot 17 story Federal Courthouse to be solicited in a subsequent announcement. The Former State Building is located at 107 West Broadway, between 1st and 2nd Streets and also bordering on Hill Street in Downtown Los Angeles, California. The building occupies a portion of a block and is 523,000 gross square feet and includes an adjacent parking structure. It is a steel frame building of nine stories including basement and access tunnel extending under Broadway. The building has been abated of hazardous material with the exception of transite wall panels left in place to maintain building closure. The solicitation is anticipated to be released as a Design-Build solicitation and a Best Value selection in early July and award of the demolition contract is anticipated for September 2006. The contract will include, but is not limited to: preparation of management and demolition plans including but not limited to detailed procedures for method of accomplishment, staging, removal of materials, recycling and development of shoring plans to protect adjacent streets and structures as required to perform the work; coordination with local agencies; design submittals to GSA for review of compliance with the design guidelines; quality control review of documents; constructability review of the contract documents and drawings; monitoring and documenting quality; developing innovative opportunities to improve the projects design of abatement and demolition procedures; provide project coordination between subcontractors, as well as Quality Assurance and Quality Control functions; monitor cost and schedule, provide cost estimates, reports; and provide all safety function, all necessary permits and environmental requirements. GSA has established a LEEDS goal of Silver for the New Los Angeles Federal Courthouse and the Contractor shall identify and implement any aspect of the abatement and demolition that qualifies for points toward that goal. For further information, contact Ms. Beverly Chin at 415.522.3141 or beverly.chin@gsa.gov.
Reply With Quote
Sponsored Links

Why not Register? or Log in to remove these ads
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On
Forum Jump


Forum Sponsors



Partners
Dexpan Silent Demo
Diamond Tools SuperCenter
High Reach Demo
Scrap Metal Prices
EnviroBidNet
Heavy Equipment Forums
Lawn Cafe
Phillyblast
Excavator Trader
Home Theater Forum

Advertising Partner


All times are GMT -7. The time now is 01:46 PM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.2.0
© 2005-2008 DemolitionForum - All Rights Reserved