Demolitionforum.com Forums  

Register Now! Demolition Tool Store - Demolition Gallery - Classifieds - Advertising Info - Forum Guidelines

Welcome to Demolition Forum, the only Online Source for Demolition News and Discussion.

You are currently viewing our boards as a guest which gives you limited access. By joining our free community you will have access to reading the latest in Industry News, Read and learn from the experts, Upload your own demolition photos to your photo album, read and learn from the experts, and many other special features.

Registration is fast, simple and absolutely free so please, join our community today!

If you have any problems with the registration process or your account login, please contact us.


Go Back   Demolitionforum.com Forums > DEMOLITION TOPICS > Industry News

Industry News Updated Every Weekday! Read and share the latest in demolition news from around the world. Where you can read industry press releases or add your own.


Why not Register? or Log in to remove these ads
Reply
 
LinkBack Thread Tools Display Modes
  #1 (permalink)  
Old 04-17-2007, 06:48 AM
James's Avatar
Administrator
 
Join Date: Aug 2005
Location: Kent, WA.
Posts: 4,206
Send a message via AIM to James Send a message via MSN to James
Default Wrecking Corp Completes Demolition of Post-Tensioned Building

Wrecking Corp of America recently completed demolition and excavation work at the Tysons Corner site of Liberty Crossing, the former home of Nextel, a 256,000-square-foot, 10-story post-tensioned building in McLean, Virginia. The building owner was Peterson Companies, and the general contractor was Clark Construction Group of Bethesda, Maryland.

"Post-tensioning is a method of concrete reinforcement using steel cables (tendons) that are tensioned after the concrete hardens," said Terry Anderson, executive vice president of Wrecking Corp. "Since post-tensioning has only been in use since the 1970's, very few post-tensioned buildings have been razed. Wrecking Corp has razed six post-tensioned buildings in the last few years. We feel that we have more experience than most in razing this type of structure, but each one has reacted differently during the razing process, so there is no room for complacency when working with post-tensioning."

"These buildings present a unique challenge to the demolition industry," Anderson said, "because they have the potential for a sequential collapse once some of the tendons are de-tensioned. In addition, the steel cables are dangerous because of their rubber-band-like quality; they also are difficult to process for recycling."

The Liberty Crossing project also included excavation of 100,000 cubic yards of soil and backfill of 20,000 cubic yards on site. The project was completed in six months.
__________________
Still just visiting? Come say Hello!
We have some open advertising spots available
Reply With Quote
Sponsored Links

Why not Register? or Log in to remove these ads
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On
Forum Jump


Forum Sponsors



Partners
Dexpan Silent Demo
Diamond Tools SuperCenter
High Reach Demo
Scrap Metal Prices
EnviroBidNet
Heavy Equipment Forums
Lawn Cafe
Phillyblast
Excavator Trader
Home Theater Forum

Advertising Partner


All times are GMT -7. The time now is 09:49 AM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.2.0
© 2005-2008 DemolitionForum - All Rights Reserved