Demolitionforum.com Forums  

Register Now! Demolition Tool Store - Demolition Gallery - Classifieds - Advertising Info - Forum Guidelines

Welcome to Demolition Forum, the only Online Source for Demolition News and Discussion.

You are currently viewing our boards as a guest which gives you limited access. By joining our free community you will have access to reading the latest in Industry News, Read and learn from the experts, Upload your own demolition photos to your photo album, read and learn from the experts, and many other special features.

Registration is fast, simple and absolutely free so please, join our community today!

If you have any problems with the registration process or your account login, please contact us.


Go Back   Demolitionforum.com Forums > DEMOLITION TOPICS > Industry News

Industry News Updated Every Weekday! Read and share the latest in demolition news from around the world. Where you can read industry press releases or add your own.


Why not Register? or Log in to remove these ads
Closed Thread
 
LinkBack Thread Tools Search this Thread Display Modes
  #1 (permalink)  
Old 03-27-2007, 10:39 AM
NukeWorker's Avatar
Senior Member
 
Join Date: Jul 2006
Posts: 845
Default RCA Dome Demolition

It looks like the construction manager is trying to figure out the "best way" to demolish the RCA DOme in Indianapolis.


http://www.wthr.com/Global/story.asp?S=6283558
Sponsored Links

Why not Register? or Log in to remove these ads
  #2 (permalink)  
Old 03-27-2007, 11:36 AM
rdz rdz is offline
Senior Member
 
Join Date: Dec 2005
Posts: 164
Default

Maybe they should leave that up to the demolition contractors? They usually know best.
  #3 (permalink)  
Old 03-27-2007, 03:55 PM
NukeWorker's Avatar
Senior Member
 
Join Date: Jul 2006
Posts: 845
Default

If I remeber correctly, that didn't work too well on the demolition of the Market Square Arena.

The first time they bid the project the low bidder was going to build a giant ramp and walk his excavators to the roof and hammer it down.

Then they rebid it to blast it and that didn't work out very well. The contractor in charge of the debris removal ended up suing because the debris didn't break apart.
  #4 (permalink)  
Old 03-28-2007, 06:59 AM
Member
 
Join Date: Oct 2005
Posts: 7
Default Wrong on both accounts.

The first time the owner tried to forbid blasting and forced an improper method. The plan was to try and used a shear to cut the center ring. Blasting was clearly the right choice.

The second time they created two seperate GC packages one for the blasting and one for the prep/cleanup. This created an obvious finger pointing arrangement. No lawsuit was ever filed. The PM works for our firm and I bid the job both times.

The real problem was the project design tried to dictate means and methods. RDZ you hit it on the head very few engineers/architects have the experience to write a good spec for large demolition projects such as stadiums.
  #5 (permalink)  
Old 03-28-2007, 11:20 AM
NukeWorker's Avatar
Senior Member
 
Join Date: Jul 2006
Posts: 845
Default

What was the amount of the "extra" that the contractor received for debris removal?

I don't agree with you that many engineers/architects have the experience to write a good spec on stadium/arena projects. For the most part, they are structurally repetitive entities surounded by large parking areas. From a demolition standpoint it doesn't get any better than that. You have a lot of working room and limited 3rd party liability.

Besides, it is my understanding that for the last couple of stadium/ arena jobs the specs were actually written in collaboration with a demolition contractor.
  #6 (permalink)  
Old 03-28-2007, 02:29 PM
Member
 
Join Date: Oct 2005
Posts: 7
Default

The extra is not something I would share to strangers or the internet, none of my or anyones business.

We will have to disagree about the design issues. Many of the stadiums are forced to tight schedules and separations or adjacent operations like the subject project.

As you have pointed out if it were not for the often time "free of charge" collaboration that designers count on, many other extras would be paid on the shoulders of tax payers.
  #7 (permalink)  
Old 03-29-2007, 07:49 AM
rdz rdz is offline
Senior Member
 
Join Date: Dec 2005
Posts: 164
Default

The Market Square Arena shot went just fine. The pile was high due to the fact that there was a reinforced concrete tunnel running through the center of the building. If you ever saw it, you would most certainly remember you could drive under the building on a City street. Again, as you remember, that road had every utility you could think of underneath. All of which were to remain live throughout the project. The building collapse as far as it possibly could. Everyone knew the tunnel was to remain, there were no surprises for anyone.

Remember this, rfk, they asked us. If they asked you, would you say no?
  #8 (permalink)  
Old 03-29-2007, 10:59 AM
NukeWorker's Avatar
Senior Member
 
Join Date: Jul 2006
Posts: 845
Default

I guess they lucked out on the extra then. But you are straying from the initial point you raised about AE's dictating means and methods and how flexible/inflexible specs should be.

BTW What/who is rfk?
  #9 (permalink)  
Old 03-29-2007, 12:57 PM
rdz rdz is offline
Senior Member
 
Join Date: Dec 2005
Posts: 164
Default

I am not straying. They asked us for a price, we gave them one, they gave us a contract, we shot the building. It was their decision, their money. We did not write the specs.

I still stand by my original post: Let the contractor's decide.
  #10 (permalink)  
Old 03-29-2007, 08:30 PM
NukeWorker's Avatar
Senior Member
 
Join Date: Jul 2006
Posts: 845
Default

I agree with you to a point and I also agree with DemoEngr to a point. Let the contractors decide but don't try and split the contract between 2 contractors.
Sponsored Links

Why not Register? or Log in to remove these ads
Closed Thread


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On
Forum Jump


Forum Sponsors



Partners
Dexpan Silent Demo
Diamond Tools SuperCenter
High Reach Demo
Scrap Metal Prices
EnviroBidNet
Heavy Equipment Forums
Lawn Cafe
Phillyblast
Excavator Trader
Home Theater Forum

Advertising Partner


All times are GMT -7. The time now is 04:18 AM.


Powered by vBulletin® Version 3.7.4
Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.2.0
© 2005-2008 DemolitionForum - All Rights Reserved