Demolitionforum.com Forums  

Register Now! Demolition Tool Store - Demolition Gallery - Classifieds - Advertising Info - Forum Guidelines

Welcome to Demolition Forum, the only Online Source for Demolition News and Discussion.

You are currently viewing our boards as a guest which gives you limited access. By joining our free community you will have access to reading the latest in Industry News, Read and learn from the experts, Upload your own demolition photos to your photo album, read and learn from the experts, and many other special features.

Registration is fast, simple and absolutely free so please, join our community today!

If you have any problems with the registration process or your account login, please contact us.


Go Back   Demolitionforum.com Forums > DEMOLITION TOPICS > Industry News

Industry News Updated Every Weekday! Read and share the latest in demolition news from around the world. Where you can read industry press releases or add your own.


Why not Register? or Log in to remove these ads
Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1 (permalink)  
Old 01-31-2007, 08:18 AM
James's Avatar
Administrator
 
Join Date: Aug 2005
Location: Kent, WA.
Posts: 4,294
Send a message via AIM to James Send a message via MSN to James
Default USU's Demolition of Engineering Building to begin

The fences surround the 43-year-old Engineering Classroom Building at Utah State University, which is scheduled to be demolished starting Feb. 1 to make room for a new four-story engineering building, said Maurice Thomas, associate dean of the College of Engineering. Demolition of the current building will likely take about one month, and construction of the new building, which is scheduled to begin in April, is expected to take 18 months to two years, he said. Meanwhile, the fences will remain in their current position until after construction is complete.

"We just ask that people understand that this is part of a project that's going to be improving campus," Thomas said.

The walkway between the new engineering building and Merrill Hall is currently blocked off because that space will be used as the primary entrance for demolition and construction vehicles to access the site, Thomas said. Merrill Hall residents will likely be disturbed by the vehicles, but that route is the only viable option for getting large machinery and vehicles to the site, he said. Project officials have petitioned the Utah Department of Transportation for permission to access the site from State Highway 89 by going between Merrill Hall and Reeder Hall but do not expect permission to be granted.

The new building will be called the David G. Sant Engineering Innovation Building after a USU alumnus who made a large donation toward its construction. It will have four floors, and its exterior will look similar to the existing Engineering Building east of it, Thomas said. It will not have any classrooms but instead be used primarily for engineering research projects. Its construction will be funded mainly by contributions but also by state funds that were attained several years ago, he said.

The Engineering Classroom Building, which was built in 1964, is being replaced because it is "high on the list of state buildings that are vulnerable to earthquake," Thomas said. The auditorium would be especially vulnerable if an earthquake were to strike, and anyone inside would be in extreme danger, he said.

Crews recently finished removing potentially hazardous materials from the building, such as asbestos and mercury, and the site was turned over Friday to the company that will be demolishing the building and removing its pieces, Thomas said. On Friday, Saturday and Sunday, the building was to have been used in training exercises by local law enforcement and fire agencies, he said.

"They want to use it because they can knock doors down, shoot holes in things, and no one cares," he said.

The location of fences surrounding the building has made it necessary for people to walk through the snow and on the grass in some areas, but concrete walkways will be laid in the new high-traffic areas as soon as the weather allows for it, Thomas said.

In addition to the areas already fenced off, the area between the Engineering Classroom Building and the nearby Engineering Laboratory Building will be temporarily closed at some point during demolition so on the 2nd floor enclosed walkway between the two buildings can be taken down.
__________________
Still just visiting? Come say Hello!
We have some open advertising spots available
Reply With Quote
Sponsored Links

Why not Register? or Log in to remove these ads
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On
Forum Jump


Forum Sponsors



Partners
Dexpan Silent Demo
Diamond Tools SuperCenter
High Reach Demo
Scrap Metal Prices
EnviroBidNet
Heavy Equipment Forums
Lawn Cafe
Phillyblast
Excavator Trader
Home Theater Forum

Advertising Partner


All times are GMT -7. The time now is 03:46 AM.


Powered by vBulletin® Version 3.7.4
Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.2.0
© 2005-2008 DemolitionForum - All Rights Reserved