Demolitionforum.com Forums  

Register Now! Demolition Tool Store - Demolition Gallery - Classifieds - Advertising Info - Forum Guidelines

Welcome to Demolition Forum, the only Online Source for Demolition News and Discussion.

You are currently viewing our boards as a guest which gives you limited access. By joining our free community you will have access to reading the latest in Industry News, Read and learn from the experts, Upload your own demolition photos to your photo album, read and learn from the experts, and many other special features.

Registration is fast, simple and absolutely free so please, join our community today!

If you have any problems with the registration process or your account login, please contact us.


Go Back   Demolitionforum.com Forums > DEMOLITION TOPICS > Industry News

Industry News Updated Every Weekday! Read and share the latest in demolition news from around the world. Where you can read industry press releases or add your own.


Why not Register? or Log in to remove these ads
Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1 (permalink)  
Old 10-06-2006, 08:09 AM
James's Avatar
Administrator
 
Join Date: Aug 2005
Location: Kent, WA.
Posts: 4,294
Send a message via AIM to James Send a message via MSN to James
Default Date set for Higgins plant demolition

The implosion of Progress Energy's obsolete A.W. Higgins power plant has been rescheduled for 8 am on October 20th, when the summertime demand for electricity should have subsided.

The old plant is on Booth Point at the north end of Tampa Bay in Oldsmar but is clearly visible from parts of Safety Harbor and from Clearwater's Courtney Campbell Parkway.

The plant, which sits on 5 of the site's 142 acres hasn't been used since 1993 and was officially retired in 1996.

Originally, the City Council was told by Progress Energy representatives that the building would be imploded in late June or early July. However, the tentative date kept getting pushed back.

There is a smaller power plant on the site being used to generate power as needed. That plant will be out of use on the day of the Higgins plant implosion, said Progress Energy spokeswoman Cherie Jacobs.

The demolition was held off until cooler weather, when the smaller plant wouldn't be needed to generate power for air-conditioning.

"During the summer we didn't want to have reliability issues," Jacobs said.

"We wanted to have that plant running."

Progress Energy will send out 600 letters to residents close to the plant and along the main roads leading to the plant the weekend before the implosion to notify them about what to expect during it. No residents will have to be evacuated from their homes, Jacobs said. There will be a safety perimeter of 2,000 feet on land and water.

No one will be allowed to visit the plant site any time before or after the implosion, Jacobs said.

On the day of the implosion, Philippe Park, which has a prime view of the building, will open at 6:30 a.m., 30 minutes earlier than usual, Jacobs said.

However, she warned the park's parking is limited.

Dismantling the building will cost $1.2-million, but the market for scrap metal is at historic highs, Jacobs said. The 64,000-square-foot power plant has 6,000 tons of metal to sell.

Cleanup of asbestos and other hazardous materials was complete in July, Jacobs said. The 5 acres the building sits on will serve as an environmental buffer zone.

As for the demolition, less than 75 pounds of explosives will be used to implode the building by Controlled Demolition Inc. of Maryland, Jacobs said. It will take eight to 10 seconds from the first of five blasts until the building is on the ground. Cleanup will be complete by the end of the year.
Attached Images
File Type: jpg higgins.jpg (7.9 KB, 13 views)
__________________
Still just visiting? Come say Hello!
We have some open advertising spots available
Reply With Quote
Sponsored Links

Why not Register? or Log in to remove these ads
  #2 (permalink)  
Old 10-06-2006, 09:21 AM
NukeWorker's Avatar
Senior Member
 
Join Date: Jul 2006
Posts: 845
Default

Who is the General Contractor?
Reply With Quote
  #3 (permalink)  
Old 10-06-2006, 04:48 PM
rdz rdz is offline
Senior Member
 
Join Date: Dec 2005
Posts: 164
Default

Demco
Reply With Quote
Sponsored Links

Why not Register? or Log in to remove these ads
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On
Forum Jump


Forum Sponsors



Partners
Dexpan Silent Demo
Diamond Tools SuperCenter
High Reach Demo
Scrap Metal Prices
EnviroBidNet
Heavy Equipment Forums
Lawn Cafe
Phillyblast
Excavator Trader
Home Theater Forum

Advertising Partner


All times are GMT -7. The time now is 04:43 AM.


Powered by vBulletin® Version 3.7.4
Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.2.0
© 2005-2008 DemolitionForum - All Rights Reserved