Early in my demo career I had a stairwell collapse into the back of a knitting shop, it was not a good day. I had argued with the owner and his "engineer" about the stability of the section and wanted to hand demo it to a safe level. The owner wanted it to stay because he had just paid a roofer 3000 to fix the roof of the stairwell. Luckily I put my objections in the form of a certified letter to the owner and I was not held accountable. It cost him about 7000 in repairs to the shop owner.
|