View Single Post
  #2 (permalink)  
Old 06-17-2008, 02:46 PM
concreterick's Avatar
concreterick concreterick is offline
Member
 
Join Date: Nov 2007
Location: Michigan
Posts: 33
Default

This one doesn't sound like much fun. The 4" remaining will look pretty ugly and be weakened from the chipping. I would vote for full depth removal and pour back with only 1200 sqft.

Obviously my opinion isn't worth a darn if you have special site conditions, i.e. contamination, difficult location, war zone, lunar surface, etc.

Good Luck,
Rick
Reply With Quote