View Single Post
  #2 (permalink)  
Old 01-18-2006, 10:01 PM
DemoDave1 DemoDave1 is offline
Banned
 
Join Date: Nov 2005
Location: Westchester, NY
Posts: 22
Default

So if I read this correctly CDI is the General Demoliton Contractor? When did they decide to bite the hand (all the rest of the General Demolition Contractors) that feeds them?
Why when Control Demolition is the General Contractor they specify half as much preparation as when they are a subcontractor? When they work for somebody else they work on half as many floors but they specify twice as much protection.