View Single Post
  #6 (permalink)  
Old 10-15-2007, 07:39 PM
KeppleServices KeppleServices is offline
Member
 
Join Date: Feb 2006
Location: Orlando
Posts: 39
Send a message via AIM to KeppleServices
Default

The only thing I am thinking is that the ceiling is to high to reach with the tool and I will still have to be on a lift to get high enough. I will have 2 lifts on site in the building anyway for the A/C ductwork and lighting removal. Its an old grocery store. I am going down in the morning to look at the store so I will see for sure.
Reply With Quote