View Single Post
  #3 (permalink)  
Old 08-12-2007, 02:04 AM
geertyke geertyke is offline
Member
 
Join Date: Nov 2005
Posts: 21
Default

Project is located in Germany (dinslaken). Demolishing of an old coal mine. The shear is now hanging on the new cat 5110b tripple. The shear worked on the short boom until the time the 5110b tripple was finished. The one with short boom is one of the 2 5110b's from Euro Demolition. At the time that machine worked with short boommand shear, the other was completely rebuild to a 5110b tripple.
Attached Images
File Type: jpg 5110b tripple.jpg (72.8 KB, 35 views)
Reply With Quote