View Single Post
  #2 (permalink)  
Old 02-11-2007, 01:19 PM
blast1 blast1 is offline
Junior Member
 
Join Date: Apr 2006
Location: IDAHO
Posts: 91
Default

The job was tough because the building was prepped to trip and the game plan changed when the equipment used didn't have the horsepower! We actually shot through the webs and had 3 beams holding up over 1,500 tons of building. What made this job difficult was, 1st...working for Bayer, 2nd...no flanges to use shape charges.
It came down safely and broke up very well though!
Reply With Quote