View Single Post
  #1 (permalink)  
Old 08-17-2006, 05:14 PM
ALLPRO ALLPRO is offline
Member
 
Join Date: Mar 2006
Location: Big Southeast Texas
Posts: 9
Default concrete cutting

Anyone know an easy formula for bidding on cutting a trench in a slab. I am working a job and they asked me to cut a trench for plumbers. And to let them know what they owe me. I always try to be fair and competitive but I have not ever cut a trench like this. It is 6" concrete that is going to be cut one time 144' long. It is up against the back of a building and will be a 3' trench and I will have to breakup and haul off. Any advice would help Thanks.
Reply With Quote
Sponsored Links

Why not Register? or Log in to remove these ads